What this page is for
Use the planner when the real problem is not “did we do ten days” but “will the key activity still land inside an HA current date range, and are we drifting toward lapse before the next accountable period.”
- Single-soldier HA planning against upcoming key activities.
- Spotting which date ranges cannot yet be confirmed from the log or are about to lapse.
- Keeping the rolling currency rule visible instead of buried in memory or WhatsApp chats.
How to use the warnings properly
The red and amber states are there to help you plan earlier, not to replace medical or command judgment. If unit instructions, local safety direction, or medical guidance say otherwise, those take priority over this page.
- Red means the tracker had previously observed HA current status, but the rolling 14-day window no longer contains a qualifying pair.
- Amber means the logged plan does not contain enough trailing HA history to confirm maintained currency on those dates.
- Green means the trailing 14-day window already contains 2 HA activities within 7 days.
- This page assumes HA Qualification already exists and does not decide whether a formal HA refresher has been completed.
Public references and limits
Public SAF sources confirm that heat acclimatisation exists, but they do not publish every local edge case. This planner is implemented around the rolling HA currency rule from the directive, assumes the soldier already has HA Qualification, and unit-specific exceptions or refresher decisions should still be clarified locally.
Important disclaimer
Adjust this planner to your unit reality
Unit policies, commander direction, safety decisions, and medical guidance may override anything on this page. This planner assumes HA Qualification already exists and focuses on rolling currency maintenance from the sessions you log. What counts as a valid HA activity, and how many PT sessions are needed to maintain HA, may differ by unit, formation, conduct type, or local interpretation.
Use this planner as a planning aid only, adjust it according to your unit's actual practice, and clarify edge cases locally. NSVault and this page are not liable for any decision, training outcome, administrative issue, safety incident, or classification outcome arising from use of this planner.